电力工程变电站一次设备安装调试施工技术分析

Analysis of Construction Technology of Primary Equipment Installation and Debugging of Substation in Power Engineering

陆嘉
科技资讯2024,Vol.22Issue(24) :71-73.DOI:10.16661/j.cnki.1672-3791.2410-5042-0875

电力工程变电站一次设备安装调试施工技术分析

Analysis of Construction Technology of Primary Equipment Installation and Debugging of Substation in Power Engineering

陆嘉1
扫码查看

作者信息

  • 1. 国网白城供电公司 吉林白城 137000
  • 折叠

摘要

电力工程变电站一次设备在电力系统中扮演着至关重要的角色,其直接参与电能生产、输送、转换过程,促进电力系统的高效运行.详细介绍了变电站一次设备的问题,探讨这些设备的安装技术和调试方法,通过深入分析母线、电缆、变压器、隔离开关等设备的安装调试技术,为电力工程维护提供技术指导,有助于提高电力系统的运行效率.

Abstract

The primary equipment of power engineering substation plays a vital role in the power system,which di-rectly participates in the process of electric power production,transmission and conversion,and promotes the effi-cient operation of the power system.This paper introduces the problems of substation primary equipment in detail,discusses the installation technology and debugging method of these equipment.and provides technical guidance for power engineering maintenance through in-depth analysis of the installation and debugging technology of busbar,cable,transformer,isolation switch and other equipment,which is conductive to improving the operation efficiency of power system.

关键词

电力工程/变电站一次设备/母线安装/电缆安装

Key words

Power engineering/Primary equipment of substation/Busbar installation/Cable installation