The primary equipment of power engineering substation plays a vital role in the power system,which di-rectly participates in the process of electric power production,transmission and conversion,and promotes the effi-cient operation of the power system.This paper introduces the problems of substation primary equipment in detail,discusses the installation technology and debugging method of these equipment.and provides technical guidance for power engineering maintenance through in-depth analysis of the installation and debugging technology of busbar,cable,transformer,isolation switch and other equipment,which is conductive to improving the operation efficiency of power system.
关键词
电力工程/变电站一次设备/母线安装/电缆安装
Key words
Power engineering/Primary equipment of substation/Busbar installation/Cable installation