Analysis of Construction Technology of Primary Equipment Installation and Debugging of Substation in Power Engineering
The primary equipment of power engineering substation plays a vital role in the power system,which di-rectly participates in the process of electric power production,transmission and conversion,and promotes the effi-cient operation of the power system.This paper introduces the problems of substation primary equipment in detail,discusses the installation technology and debugging method of these equipment.and provides technical guidance for power engineering maintenance through in-depth analysis of the installation and debugging technology of busbar,cable,transformer,isolation switch and other equipment,which is conductive to improving the operation efficiency of power system.
Power engineeringPrimary equipment of substationBusbar installationCable installation