Qinglan bridge steel girder construction using 01# segment scattered spell installation and temporary anchorage; standard section by using a flat wire type deck crane whole segments of double cantilever erection; cable force control and adjustment; the middle span closure segment construction of the main measures to control points.
Qinglan Bridge GirderInstallation of 01# segment of temporary consolidation cableclosure section