Research on Intelligent Laying Technology of 500 kV Large-Section High-Voltage Cable
With the rapid development of social economy and the continuous growth of electricity demand,the urban transmission system is gradually developing from overhead line to power cable,power cable is gradually developing to have a higher voltage level and greater transmission capacity,the introduction of 500 kV high-voltage power cable line into the city center has been imperative.This paper expounds and analyzes the construction method of intelligent laying of 500 kV high-voltage cross-linked power cable,hoping to play a reference role for the specific implementation of 500 kV cable project in the future.