浅析进度控制技术管理在WZ6-13油田开发工程项目中的应用

Application of Schedule Control Technology Management in WZ6-13 Oil Field Development Engineering Project

郑余湛
科学与信息化2024,Issue(8) :190-192.

浅析进度控制技术管理在WZ6-13油田开发工程项目中的应用

Application of Schedule Control Technology Management in WZ6-13 Oil Field Development Engineering Project

郑余湛1
扫码查看

作者信息

  • 1. 中海石油(中国)有限公司湛江分公司 广东 湛江 524057
  • 折叠

摘要

文章就海洋工程项目进度控制技术中的方案编制、执行、跟踪、检查、调整等内容,结合WZ6-13油田开发工程项目实例,论述了进度控制的重要性.文中所阐述的海洋工程项目进度控制技术,可以供海洋石油开发工程建设项目借鉴,作为夯实海洋工程项目管理的基础.

Abstract

This paper discusses the importance of schedule control based on the scheme formulation,execution,tracking,inspection and adjustment of schedule control technology in ocean engineering project,in combination with an example of WZ6-13 oil field development engineering project.The schedule control technology of ocean engineering projects described in this paper can be used as reference for offshore oil development engineering construction projects and as the basis for consolidating the management of ocean engineering projects.

关键词

海洋工程/项目/计划管理/进度计划控制

Key words

ocean engineering/project/plan management/schedule plan control