The shield machine is widely used in tunnel engineering,it can replace personnel to perform tunnel excavation and effectively improve the mechanization level of construction and the construction efficiency,and can also provide safety guarantee for tunnel construction.The shield machine is the main construction equipment of tunnel engineering,and has the characteristics of high acquisition cost and long life cycle,so it is necessary to strengthen equipment management and maintenance,so as to ensure that the shield machine has good working performance and healthy operation status for a long time,and accordingly prolong the service life of the shield machine.This paper mainly analyzes the whole life cycle management of shield construction equipment,hoping to help relevant enterprises.
shield construction equipmentwhole life cycle managementmanagement