Research on Cost Management of Equipment Installation Engineering of Ultra-High Voltage Alternating Current Gas Insulated Substation Based on Earned Value Analysis Method
In order to actively adapt to the needs of economic development,China vigorously develops indoor compact ultra-high voltage alternating current gas insulated substation(GIS).This substation improves land use efficiency[1],enhances the power supply capacity of the power grid,effectively alleviates the power utilization shortage,and promotes economic development[2].This paper makes an in-depth analysis on the existing problems in the cost management of alternating current GIS equipment installation projects,formulates the work breakdown structure(WBS)of alternating current GIS equipment installation projects[3],obtains the deviation factors affecting the cost of engineering projects through the earned value analysis at different months,and proposes improvement and optimization measures.
cost managementwork breakdownearned value analysis method