首页|柳钢2032热轧卷取侧导板的控制研究和改进

柳钢2032热轧卷取侧导板的控制研究和改进

扫码查看
本文首先通过对柳钢2032热轧生产线,卷取机侧导板设备控制原理进行分析;其次提出板卷在卷取过程中出现错层的各种原因;接着就不同原因提出解决问题的方法;最后针对错层问题,对侧导板控制系统进行了优化方案设计,以供参考.
Research and Improvement on Liuzhou Steel 2032 Hot-Rolled Coiling Side Guide Plate Control
This paper firstly analyzes the principle of Liuzhou Steel 2032 hot rolling production line coiler side guide plate equipment control;Secondly,various reasons for the staggering of sheet coils in the coiling process are proposed;Subsequently,solutions to the problems are proposed as per different causes;Finally,to address the staggering problem,the optimization scheme design of the side guide plate control system is carried out for reference.

hot rollingcoiling side guide platestaggering

黄棱、张云权、蒋小宇

展开 >

广西柳州钢铁集团有限公司热轧板带厂 广西 柳州 545002

热轧 卷取侧导板 错层

2024

科学与信息化

科学与信息化

ISSN:
年,卷(期):2024.(19)