Research on Installation Construction Technology of Electrical Equipment in 10kV Distribution Network Transformer and Distribution Room
In view of the current problems of high electromagnetic radiation and high noise during operation after the installation of electrical equipment,this paper carries out the research on the installation construction technology of electrical equipment in the transformer and distribution room of 10kV distribution network.According to the process of laying and trench dredging-pipeline embedding-pipeline connection and testing,the embedding and laying of electrical equipment pipelines in the 10kV distribution network transformer and distribution room are completed.The lightning protection down conductor is set up,and the grounding device is installed.The cable installation construction and the socket,switch and distribution box installation are completed.The example proves that after the application of the new construction technology,the electromagnetic radiation and noise level of the electrical equipment in the whole stage can be controlled within a reasonable range,and the impact of the electrical equipment installation on the environment can be minimized.
distribution networkelectrical equipmentconstructioninstallationdistribution room