矿业快报2012,Issue(1) :11-14.

兰尖铁矿1~#、3~#运输平硐失稳机理分析与治理

Analysis of Instability Mechanism Ore Hauling Tunnel in Lanjian Iron Mine 1~#、3~# and Engineering Control

刁虎
矿业快报2012,Issue(1) :11-14.

兰尖铁矿1~#、3~#运输平硐失稳机理分析与治理

Analysis of Instability Mechanism Ore Hauling Tunnel in Lanjian Iron Mine 1~#、3~# and Engineering Control

刁虎1
扫码查看

作者信息

  • 1. 中钢集团马鞍山矿山研究院有限公司/金属矿山安全与健康国家重点实验室
  • 折叠

摘要

对攀钢兰尖铁矿运输平硐局部地段出现失稳现象,运用有限元数值对其进行了模拟,考虑采矿水平不断下降、露天采场爆破震动对其产生的影响,并对采用预应力锚索和钢拱联合支护效果进行了分析,对类似情况的隧洞分析提供一定的借鉴作用。

Abstract

To the instability phenomenon appeared at haulage tunnel local section of a mine,simulation was done by using finite element numerical,effects from continuously decreased mining level,open pit blasting vibration were considered,combining prestressed anchor cable and steel arch support effect were analyzed,provided a certain reference for similar tunnel analysis.

关键词

运输平硐/爆破震动/锚索/钢拱架/有限元

Key words

Haulage tunnel/Blasting vibration/Anchor cable/Steel arch frame/Finite element