预裂控顶是改善沿空留巷邻面厚硬顶板强矿压显现的主要技术手段之一.针对张集矿1615A工作面留巷二次开采厚硬顶板难冒落问题,采用理论分析、数值模拟、现场实践的方法展开研究.通过理论分析建立了工作面预裂切顶顶板力学模型,得到4种工况下顶板位移、来压步距表达式,计算得出未进行预裂切顶初次来压步距为50.06 m、周期来压步距为21.04 m,预裂爆破后初次来压步距为31.66 m、周期来压步距为14.6 m;结合工程地质条件,设计厚硬顶板预裂控顶方案,并进行数值模拟,结果表明,预裂爆破后,破断步距得到有效缩短,工作面应力峰值降低21.46%~22.52%,有效改善了超前支承压力的影响;现场监测数据表明,预裂控顶效果明显,有效减少了矿压显现现象.研究结果可为类似沿空留巷工作面预裂控顶提供参考.
Research on Pre-Splitting Roof Control Technology of Thick and Hard Roof Without Coal Pillar Under Secondary Mining
Pre-splitting roof control is one of the main technical means to improve the strong mine pressure behavior of thick and hard roof on the adjacent surface of gob-side entry retaining.Aiming at the problem of difficult caving of thick and hard roof in secondary mining of 1615A working face in Zhangji Mine,theoretical analysis,numerical simulation and field practice were used to study.Through theoretical analysis,the roof mechanical model of pre-splitting roof cutting in working face was established,and the expressions of roof displacement and weighting step distance under four working conditions were obtained.The first weighting step distance without pre-splitting roof cutting is 50.06 m,and the periodic weighting step distance is 21.04 m.The first weighting step distance after pre-splitting blasting is 31.6 m,and the periodic weighting step distance is 14.6 m.Combined with the engineering geological conditions,the pre-splitting roof control scheme of thick and hard roof was designed,and the numerical simulation was carried out.The results show that after the pre-splitting blasting,the breaking step distance is effectively shortened,the peak stress of the working face is reduced by 21.46%-22.52%,and the influence of the advanced abutment pressure is effectively improved.The field monitoring data show that the effect of pre-splitting roof control is obvious,and the phenomenon of mine pressure appearance is effectively reduced.The research results can provide reference for pre-splitting and roof control of similar gob-side entry retaining working face.

Secondary miningThick and hard roofRoof cutting and pressure reliefPre-splitting blastingNumerical simulation

张欣、涂敏、张向阳、赵高明、郭福鑫

展开 >

安徽理工大学矿业工程学院,安徽淮南市 232001

二次采动 厚硬顶板 切顶卸压 预裂爆破 数值模拟

国家自然科学基金面上项目国家自然科学基金面上项目安徽省高校协同创新项目

5207400852074007GXXT-2020-056