首页|中深孔爆破对采场人工假顶的影响研究

中深孔爆破对采场人工假顶的影响研究

扫码查看
为探究爆破对采场人工假顶稳定性的影响,采用LS-DYNA动态分析软件,对中深孔爆破对4.75 m厚的人工假顶的扰动破坏进行了数值计算.结果表明,在应力波自孔底向孔口方向传播的过程中,爆破应力逐渐减小,且在人工假顶中的分布均匀,衰减较快.顶部留设0.5 m厚的保护层后,人工假顶绝大部分单元的最大有效应力值小于充填体的塑性破坏强度,表明爆破作用对人工假顶的破坏较小.在某铅锌矿进行了现场爆破试验,并在人工假顶关键位置布设位移监测点,结果表明,中深孔爆破后,人工假顶和采场边帮无垮塌和冒落现象,顶板沉降位移较小,爆破效果良好.
Influence of Medium and Deep Hole Blasting on Artificial False Roof in Stopes
In order to investigate the influence of blasting on the stability of artificial false roof,LS-DYNA simulation dynamic analysis software was used to calculate the disturbance and damage of artificial false roof with thickness of 4.75 m under medium and deep hole blasting.The results show that during the propagation of stress waves from the bottom to the hole opening,the blasting stress gradually decreases,and the distribution is uniform in the artificial false roof,with fast attenuation.After leaving a 0.5 m protective layer at the top,the maximum effective stress value of most units in artificial false roof is less than the plastic zone failure stress of the filling body,indicating that the blasting effect has little impact on the damage of artificial false roof.On-site blasting tests were conducted in a lead-zinc mine,and displacement monitoring points were set up at key positions of the artificial false roof.The test results show that after medium and deep hole blasting,there is no collapse or caving phenomenon in the artificial false roof and side walls,the roof settlement is reasonable,and blasting effects are good.

Artificial false roofMedium and deep hole blastingBlasting damageNumerical simulation

刘超、王亮、张帅、唐鸣东、万孝衡、严立德、盛佳

展开 >

北方矿业有限责任公司,北京 100053

长沙矿山研究院有限责任公司,湖南长沙 410012

国家金属采矿工程技术研究中心,湖南长沙 410012

湖南科技大学,湖南湘潭市 411201

展开 >

人工假顶 中深孔爆破 爆破损伤 数值模拟

煤矿安全开采技术湖南省重点实验室开放基金

E21833

2024

矿业研究与开发
长沙矿山研究院有限责任公司 中国有色金属学会

矿业研究与开发

CSTPCD北大核心
影响因子:0.763
ISSN:1005-2763
年,卷(期):2024.44(5)