群空区下厚矿体高阶段空场嗣后废石充填法回采应用研究

扫码查看
通过对群空区下橄榄形厚矿体开采时安全条件差、顶柱损失大的难题进行分析研究,得出预留25 m安全隔离矿柱和高分段+大直径深孔凿岩高阶段空场嗣后废石充填采矿法开采厚矿体为佳.采用FLAC3D模拟分析高分段+大直径深孔凿岩高阶段空场嗣后废石充填法采场结构参数,以及对上部群空区、隔离矿柱和上中段运输巷稳定性的影响.结果表明:矿房长40 m、高75 m、间柱宽10 m时,在25 m厚安全隔离矿柱"保护"下空区稳定性良好,650 m中段运输巷因靠近矿房稳定性差而需进行变道.通过现场工业试验得出,该采矿方法节省采准工程240 m,采准周期短;不留顶柱,多回采顶柱资源量4.8万t;大直径深孔+上向扇形孔同步回采,采场生产能力达到了 1 400 t/d,生产效率大幅提高,为矿山尽快投产提供了技术支撑.
Application of High-Level Open Stoping with Subsequent Waste Rock Filling Mining Method for Thick Ore Body Under Group Goaf
Through the analysis and research on the problems of poor safety conditions and large loss of top pillars in the mining of olive-type thick ore bodies under the group goaf,it was concluded that a high-level open stoping with subsequent waste rock filling mining method with high-section and large-diameter deep-hole drilling which had a security barrier pillar with a thickness of 25 m was better to mine these thick ore bodies.FLAC3D was used to simulate and analyze the structural parameters of high-level open stoping with subsequent waste rock filling mining method with high-section and large-diameter deep-hole drilling,as well as the stability of the upper group goaf,security barrier pillar and upper and middle transport roadway.The results show that when the room length is 40 m,the height is 75 m,and the pillar width is 10 m,the stability of the goaf is good under the protection of the security barrier pillar with 25 m thickness,and the 650 m middle transport roadway needs to be changed because of the poor stability near the room.Through the field industrial tests,the mining method saved 240 m of the mining preparation engineering and the mining preparation period was short.The ore was recovered by 48 000 tons without retaining the top pillar,and the stope production capacity reached 1 400 t/d due to synchronous blasting of large-diameter deep-hole and upward fan-shaped hole,the ore recovery rate and production efficiency were greatly improved,which provided a technical support for the mine to be put into production as soon as possible.

Group goafThick ore bodyHigh-section and large-diameter deep-hole drillingHigh-level open stoping with subsequent waste rock filling mining methodNumerical simulation

张宝、陈绍民、皇甫风成、仵锋锋、秦仕文、苏致立、魏军强

展开 >

低品位难处理黄金资源综合利用国家重点实验室,福建上杭县 364204

紫金矿业集团股份有限公司,福建上杭县 364204

紫金(长沙)工程技术有限公司,湖南长沙 410208

新疆金宝矿业有限责任公司,新疆阿勒泰地区 836199

展开 >

群空区 厚矿体 高分段+大直径深孔凿岩 高阶段空场嗣后废石充填法 数值模拟

"十四五"国家重点研发计划资助项目紫金矿业集团股份有限公司2022年第二批科技计划项目

2022YFC29039005401KY2022100003

2024

矿业研究与开发
长沙矿山研究院有限责任公司 中国有色金属学会

矿业研究与开发

CSTPCD北大核心
影响因子:0.763
ISSN:1005-2763
年,卷(期):2024.44(8)