为实现煤巷快速掘进,探究支护参数调整可行性问题,以顾桥矿1211工作面运输顺槽为研究对象,采用FLAC3D数值模拟和现场验证等方法,分析了煤巷开掘后各种支护密度条件下巷道围岩的受力与变形破坏特征.结果表明:煤巷在原有支护方案(方案5)条件下支护效果最好,巷道支护密度最为适宜;通过数值模拟得出支护优化后方案(方案3),顶底板垂直应力峰值为4.1 MPa,最大顶底板位移量平均值为36.25 mm,塑性区发育高度为2.2 m,支护效果与原支护方案相近,验证了该方案的理论可行性;现场采用方案3支护后支护效果较好,巷道整体稳定,巷道变形量较小,且取得了良好的经济效益.
Feasibility Study and Application of Parameter Adjustment for Rapid Excavation Support Under Complex Conditions of Deep Coal Roadways
In order to achieve rapid excavation of coal roadways and explore the feasibility of support parameters adjustment,the transportation roadway of the 1211 working face in Guqiao Mine was taken as the research object.FLAC3D numerical simulation and on-site verification methods were used to analyze the stress and deformation failure characteristics of the roadway surrounding rock under various support density conditions after excavation of the coal roadway.The results indicate that the coal roadway has the best support effect under the original support scheme(scheme 5),presenting the most suitable support density for the roadway.Through numerical simulation,it is found that the optimized support scheme(scheme 3)can achieve a peak vertical stress of 4.1 MPa,an average maximum displacement of 36.25 mm of the roof and floor,and a plastic zone height of 2.2 m.The support effect of scheme 3 is similar to the original support scheme,verifying the theoretical feasibility of the scheme.Implementation of support scheme 3 on site has favorable outcomes,with overall stability and small deformation of the roadway,which achieved notable economic benefits.

Complex conditions of deep mineRapid excavationFeasibility studySupport density

刘乐枝、刘华举、陈登红、华心祝、鲁德沛、杨理想

展开 >

淮南矿业(集团)有限责任公司顾桥煤矿,安徽淮南市 232150

安徽理工大学矿业工程学院,安徽淮南市 232001

深井复杂条件 快速掘进 可行性研究 支护密度

2024

矿业研究与开发
长沙矿山研究院有限责任公司 中国有色金属学会

矿业研究与开发

CSTPCD北大核心
影响因子:0.763
ISSN:1005-2763
年,卷(期):2024.44(11)