Safety pre-evaluation of the relocation project of a chlor-alkali plant central control room
The explosion-proof renovation of the central control room of a chlor-alkali enterprise is introduced.A risk analysis is conducted by using the safety checklist method on the fire separation distance between the proposed central control room and the adjacent facilities within the factory,on the fire resistance rating,fire zoning and explosion resistance requirements of the central control room.Safety measures and suggestions are proposed.Thus the potential risk of fire or explosion is reduced,and the safety conditions meet the requirements of safe production.
chlor-alkali enterprisecentral control roomanti-explosion renovationrisk analysis