Discussion on Relevant Problems of Environmental Protection Acceptance Investigation Report of Transmission and Transformation Project
The national ecological environment department continues to strengthen the supervision and law en-forcement of the independent acceptance of environmental protection for the completion of construction projects,and strictly prevents the heavy form of independent acceptance.First of all,a random sample of Ningxia from 2018 to the end of 2021 covering all voltage levels,different construction units,acceptance survey units,different types of 55 power transmission and transformation construction projects completed environmental protection ac-ceptance survey report(table)to carry out quality verification;Secondly,the quality assessment is carried out from five aspects:the overall quality of the report,the general quality problems,the main quality problems,the quality of the acceptance survey unit and the environmental management of the construction unit.Finally,in view of the problems existing in the self-acceptance of enterprises,management suggestions are put forward from the aspects of strengthening the quality control of environmental protection acceptance report,promoting the normali-zation of environmental protection acceptance quality verification,and innovating the way of supervision in and after the event.The results show that 80%of the completed environmental protection acceptance survey reports have good quality after quality verification and evaluation,and 7%of the reports have poor quality.There are quality problems such as lack of specific information on electromagnetic and acoustic environment sensitive tar-gets and incomplete analysis and judgment of major changes.
power transmission and transformation construction projectcompletion of environmental report ac-ceptancequality verification