摘要

介绍了某炼化公司湿法废酸再生工艺流程,对装置运行过程中影响长周期运行的瓶颈问题进行原因分析,针对装置高温换热器管束开裂、高温除尘器过滤效果不佳、导热盐换热器频繁发生泄漏、导热盐控制阀阀盖泄漏、一级反应器入口烟气风机振动大等问题,采取了相应的整改措施,取得了良好的效果,为同类湿法废酸再生装置提供借鉴.

Abstract

The wet process waste acid regeneration process of a certain refining company is introduced,the bottleneck problems that affect long-term operation during the operation of the device are analyzed,and the corresponding rectification measures are taken to address the problems of cracking of the high-temperature heat exchanger tube bundle,poor filtering effect of the high-temperature dust collector,frequent leakage of the thermal salt heat exchanger,leakage of the thermal salt control valve cover,and large vibration of the flue gas fan at the inlet of the first stage reactor.Good results have been achieved,providing some help and reference for similar wet sulphuric acid regeneration devices.

关键词

废酸再生装置/导热盐泄漏/露点腐蚀/高温除尘器/导热盐控制阀

Key words

waste acid regeneration device/leakage of thermal conductivity salt/dew point corrosion/high-temperature dust collector/thermal conductivity salt control valve