Analysis of key points for construction schedule control under general contracting mode
赵程芝1
扫码查看
点击上方二维码区域,可以放大扫码查看
作者信息
1. 上海海丰米业有限公司(上海 200086)
折叠
摘要
本文通过对施工进度管控的措施及问题分析,深入探究了总承包模式下施工进度管控要点,加强工程整体控制.
Abstract
This article deeply explores the key points of construction schedule control under the general contracting mode by analyzing the measures and problems of construction schedule control,and strengthens the overall control of the project.
关键词
总承包/进度/管控要点
Key words
general contracting/schedule/key points of control