电缆软件在核电厂电缆施工管理过程中的应用

扫码查看
以三代核电工程建设为背景,对电缆施工管理过程中相关软件的工作原理和操作流程进行分类介绍.通过详细的应用案例讨论了电缆软件在核电厂建设过程中应用的必要性,表明专业软件的应用在提高电缆敷设端接效率和准确性上起到的积极作用,弥补了电缆设计软件对施工管理支持不足的弊端,同时实时更新的电缆敷设长度为电缆的设计和采购提供依据.电缆软件的应用为后续核电项目的软件开发和自主化进程提供支持,也为其他工程软件在电缆施工管理中的应用提供良好实践.
Software Application of Cable Construction Management in Nuclear Power Plant
Based on the third generation nuclear power project,this paper classifies and introduces the working principle and operation procedure of software during the cable construction management process,and discusses the necessity of the cable software application through the detail application cases in nuclear power plant construction process.Indicating that the application of professional software play a positive role in improving the efficiency and accuracy of cable laying and termination,and making up the drawbacks that cable design software dose not provide sufficient support for construction management.Meanwhile,the real-time update of the cable laying length provide the basis for the cable design and procurement.Software application supports software development and localization in subsequent nuclear power projects,so as to provide good practice for other engineering software application in cable construction management.

nuclear power plantcablesoftwareengineering application

武媛媛、王英鸿

展开 >

上海核工程研究设计院股份有限公司,上海 200233

核电厂 电缆 软件 工程应用

2024

流体测量与控制

流体测量与控制

ISSN:
年,卷(期):2024.5(1)
  • 4