富水地层土压平衡盾构接收盾尾二次注浆(环箍)施工技术研究
Soil Pressure Balance Shield Receiving of Water-Rich Formation Research on Construction Technology of Secondary Grouting(Hoop)
崔刚1
作者信息
- 1. 江苏中车城市发展有限公司,江苏 无锡 214000
- 折叠
摘要
随着盾构施工技术的逐渐成熟,在地下空间施工中,盾构施工技术的应用越来越广泛.现场根据图纸完成工作井施工及盾构推进.在盾构接收时,为降低富水地层盾构接收风险,一般情况下,需要对盾构盾尾部位进行二次注浆(环箍).根据不同的施工工艺,二次注浆材料也不同,其根本目的为止水,以减少盾构机接收风险.
Abstract
As the shield construction technology is more and more mature,now the underground space construction of shield construction technology is more and more widely used,the site according to the drawings well construction and shield propulsion,when receiving shield,to reduce the risk of rich water formation shield receiving,in general,the need to shield tail for secondary grouting,the term"hoop",according to different construction technology,secondary grouting material is also different,its fundamental purpose of which is to stop water and reduce the risk of shield machine receiving.
关键词
盾构接收/富水地层/二次注浆(环箍)/注浆材料/注浆量/注浆压力Key words
shield receiving/water-rich formation/secondary grouting(hoop)/grouting material/grouting amount/grouting pressure引用本文复制引用
出版年
2024