露天采矿技术2024,Vol.39Issue(6) :74-79.DOI:10.13235/j.cnki.ltcm.2024.06.017

安太堡露天矿内排土场扩容边坡稳定性分析

Stability analysis of expanding slope in internal dump of Antaibao Open-pit Mine

李延泽
露天采矿技术2024,Vol.39Issue(6) :74-79.DOI:10.13235/j.cnki.ltcm.2024.06.017

安太堡露天矿内排土场扩容边坡稳定性分析

Stability analysis of expanding slope in internal dump of Antaibao Open-pit Mine

李延泽1
扫码查看

作者信息

  • 1. 中煤平朔集团有限公司 安太堡露天矿,山西 朔州 036000
  • 折叠

摘要

为了降低安太堡露天矿外排土场的用地面积,研究了在背斜构造条件下,内排土场扩容的可行性;根据对排土现状的分析,提出了 2 套内排排土扩容方案;基于最新修正的安太堡露天矿三维地质模型、地表现状航测成果和排土方案设计,构建了边坡工程地质模型;采用极限平衡法中Spencer和M-P法对两套方案的内排土场扩容后的边坡稳定性进行了安全评价分析.结果表明:内排土场扩容方案 1 更有利于安太堡露天矿安全生产建设.

Abstract

To reduce the land area occupied by the external dump of Antaibao Open-pit Mine,the article studies the feasibility of expanding the internal dump under the conditions of anticline structures,proposes two sets of expansion plans for internal dumping based on the analysis of the current inner dumping situation.We construct a geological model of slope engineering based on the latest revised three-dimensional geological model of Antaibao Open-pit Mine,surface condition aerial survey results,and dumping plan design,evaluates the stability of the slopes after the expansion of the internal dump under the two plans for safety using the Spencer and M-P methods of limit equilibrium analysis.The results indicate that expansion plan 1 for the internal dump is more conducive to the safe production and construction of Antaibao Open-pit Mine.

关键词

露天矿/内排扩容/背斜/边坡稳定性/极限平衡法

Key words

open-pit mine/expanding the internal dump/anticline/slope stability/limit equilibrium method

引用本文复制引用

出版年

2024
露天采矿技术
煤炭科学研究总院沈阳研究院 中煤平朔煤业有限责任公司 神华准格尔能源有限责任公司

露天采矿技术

影响因子:0.274
ISSN:1671-9816
段落导航相关论文