This research aims to solving the optimal path of RGV(rail-guided vehicle)based on the simulated annealing algorithm in the heuristic algorithm to solve the problem of single and double process system operation By simulating the real system operation scenario,the researchers strengthened the stability of RGV scheduling strategy and constructed the RGV scheduling optimization model with fault handling mechanism.The result shows that the intelligent RGV scheduling optimization model based on simulated annealing algorithm can effectively meet the tar-get requirements under the expected working conditions.
关键词
工序系统/模拟退火算法/调度优化/仿真
Key words
process system/simulated annealing algorithm/scheduling optimization/simulation