兰州工业学院学报2024,Vol.31Issue(5) :55-59.

基于DEMATEL-ISM模型的智慧建筑项目现场管理方法探究

Study on On-site Management Method of Smart Building Project Based on DEMATEL-ISM Model

刘颖
兰州工业学院学报2024,Vol.31Issue(5) :55-59.

基于DEMATEL-ISM模型的智慧建筑项目现场管理方法探究

Study on On-site Management Method of Smart Building Project Based on DEMATEL-ISM Model

刘颖1
扫码查看

作者信息

  • 1. 甘肃时迈建筑工程有限公司,甘肃 兰州 730000
  • 折叠

摘要

针对建筑工程项目的全生命周期管理特点,基于决策评价与实验室分析法和解释结构模型组合,系统研究制约智慧建筑工地高质量发展因素间的层级关系,进而辨识关键制约因素,并提出了相应的改进策略和发展路径,构建支撑建筑企业现场管理、智能决策、互联协同和知识共享的信息化系统.可为建筑企业智慧工程高质量发展提供参考.

Abstract

In view of the characteristics of the whole life cycle management of construction projects,based on the combination of decision evaluation,laboratory analysis and interpretive structure model,the hierarchical relation-ship between the factors restricting the high-quality development of smart construction sites is systematically stud-ied,and then the key constraints are identified,and the corresponding improvement strategies and development paths are proposed.Build an information system that supports on-site management,intelligent decision-making,interconnection and collaboration and knowledge sharing of construction enterprises.It can provide reference for the high-quality development of intelligent engineering in construction enterprises.

关键词

DEMATEL-ISM模型/智慧工地/现场管理

Key words

DEMATEL-ISM model/smart construction site/site management

引用本文复制引用

出版年

2024
兰州工业学院学报
兰州工业学院

兰州工业学院学报

影响因子:0.205
ISSN:1009-2269
段落导航相关论文