为保证LNG薄膜罐外罐内壁面防潮层涂刷和绝热板安装施工环境满足要求,建设一套空调系统.该系统室内机置于储罐内部,室外机置于储罐外部,处理后的空气通过竖直风管送至LNG薄膜罐外罐内壁面.送风口采用孔口,能获得较好的送风效果.根据工程应用情况,该空调系统能提供满足薄膜罐施工所要求的环境条件.
Construction of Air Conditioning System during Construction Period of Large LNG Membrane Tanks
In order to ensure that the construc-tion environment for painting the moisture-proof layer on the inner wall of the outer tank of the LNG membrane tank and installing the insulation board meets the re-quirements,a set of air conditioning system is construc-ted.The indoor unit of the air conditioning system is placed inside the tank,and the outdoor unit is placed outside the tank.The processed air is sent to the inner wall of the outer tank of the LNG membrane tank through a vertical air duct.The air supply outlet adopts an orifice,which can achieve good air supply effect.Ac-cording to the engineering application,the air condition-ing system can provide environmental conditions that meet the requirements for membrane tank construction.

LNG membrane tankair condi-tioning systemvertical air ductconstruction environ-ment

赖建波、常旭宁、詹一鸣、侯谨城、姜波、郭保玲、王佩广

展开 >

北京市燃气集团研究院,北京 100011

北京燃气集团(天津)液化天然气有限公司,天津 300163

LNG薄膜罐 空调系统 竖直风管 施工环境

2024

煤气与热力
中国市政工程华北设计研究院 建设部沈阳煤气热力研究设计院 北京市煤气热力工程设计院有限公司

煤气与热力

影响因子:0.559
ISSN:1000-4416
年,卷(期):2024.44(2)