[目的]传统巷道地震超前探技术受限于炸药使用、停掘需求、预报速度、探测范围及能力等方面的不足,难以满足智能掘进工作面的高精度地质构造探测需求.[方法]随掘地震以掘进机截割煤壁的震动为震源,采用数据实时上传、自动处理及动态成像的工作模式,充分利用信息技术和软件支撑,借助于海量数据支撑下的实时连续超饱和叠加,大幅提升了对掘进工作面前方地质异常体的成像精细度.以山西王坡煤矿为研究对象,在 2条掘进巷道中部署了随掘地震监测系统,开展地质构造精细探査.[结果和结论]实际工作中,利用监测作业开展后 48 h内积累的数据,即可对掘进工作面前方 200 m范围内地质异常体成像.在 3217工作面回风巷中,成功揭示了掘进工作面前方 97 m的矸石挤压带反射异常,预报误差 1 m;在 3303工作面运输巷中,揭示了掘进工作面前方 39 m的陷落柱,预报误差 2 m;在 3303工作面运输巷中,揭示了 2处煤层破碎带异常区,其中,一处位于掘进工作前方 148 m,预报误差 1 m,另一处位于掘进工作面前方 211 m外,在前序陷落柱和煤层破碎带遮挡下,依然足以形成较强的成像结果,预报误差 3 m.结果表明:该技术探测精度高、探测距离远且探测能力强,可为瓦斯灾害的防治提供技术支持,为煤矿巷道安全高效掘进提供可靠的地质保障.
Geological structures fine monitoring using seismic-while-tunneling technique in Wangpo Mine
Traditional tunnel seismic advance detection technology is limited by the use of explosives,the need for min-ing stoppages,prediction speed,detection range,and capabilities,making it challenging to meet the high-precision geo-logical structure detection requirements of intelligent tunneling faces.In response,the seismic-while-tunneling tech-nique utilizes the vibration of the roadheader cutting the coal wall as the seismic source.This method employs real-time data upload,automatic processing,and dynamic imaging.By leveraging information technology and software support,and utilizing real-time continuous super-saturation stacking supported by massive data,the imaging precision of geolo-gical anomalies ahead of the mining face is significantly enhanced.This study,conducted in Wangpo Coal Mine in Shanxi,involved deploying a seismic-while-tunneling monitoring system in two driving tunnels to perform detailed ex-ploration of geological structures.Data accumulated within 48 hours after the commencement of monitoring can image geological anomalies within a 200-meter range ahead of the mining face.In the return airway of the 3217 working face,the reflected anomaly of the coal gangue compresssion zone 97 meters ahead of the mining face was successfully detec-ted with a prediction error of 1 meter.In the transport tunnel of the 3303 working face,a collapse column 39 meters ahead of the mining face was identified with a prediction error of 2 meters.Additionally,in the same transport tunnel of the 3303 working face,two abnormal areas of coal seam fracture zones were detected.One located 148 meters ahead of the mining face had a prediction error of 1 meter,while the other,located beyond 211 meters ahead,despite being ob-structed by a collapse column and a coal seam fracture zone,still produced relatively strong imaging results with a pre-diction error of 3 meters.These findings demonstrate that the seismic-while-tunneling monitoring technique can provide significant technical support for the prevention of gas disasters.The application results suggest that this technology is convenient for construction operations,with high detection accuracy,long detection distance,and strong detection cap-ability,providing reliable geological support for intelligent and safe tunnel excavation in coal mines.

mine safetyseismic-while-tunnelinggeological structurecoal seam fracture zonecoal gangue compress-sion zonecollapse column

赵会波、覃思、陈超、关奇、赵星伟、车建航

展开 >

山西天地王坡煤业有限公司,山西 晋城 048021

中煤科工西安研究院(集团)有限公司,陕西 西安 710077

煤炭智能开采与岩层控制全国重点实验室,陕西 西安 710077

矿井安全 随掘地震 地质构造 煤层破碎带 挤压带 陷落柱

国家自然科学基金面上项目国家重点研发计划陕西省自然科学基金陕西省自然科学基础研究计划

420741752023YFC3008903-022022JM-1592024JC-YBMS-236

2024