新街台格庙矿区北部四井选煤厂布局研究

扫码查看
为了充分发挥新街台格庙矿区一个主体整装开发优势,结合矿区各井田位置,以定量方式,对前期开发的北部四井选煤厂布局进行了多方案比较和分析。坚持"集约、共享、绿色、经济、高效"的发展理念,舍弃建设4 座矿井型选煤厂或四井联合建设 1 座群矿型选煤厂思路,选用了两井联合建设2 座群矿型选煤厂的布局。大大节约了用地面积,提高了基建设施的使用效率,实现了节能降耗举措,降低了建设投资和运行费用,提高了全员效率和设计效率,对具有类似条件的群矿型选煤厂布局具有良好的借鉴意义。
Layout of coal preparation plant of four mines in the north of Xinjie Taigemiao mining area
In order to give full play to the advantages of one main body integrated development in the Xinjie Taigemiao mining area,the layout schemes of coal preparation plants for the four mines were compared,which were developed at early stage in the north of the area,considering the location of each mine field in the mining area.Adhering to the development concept of"intensive,sharing,green,economic and efficient",the ideas of one plant for each mine and one four-mines coal preparation plant were abandoned,and a layout of building two two-mines coal preparation plants was selected.The scheme greatly saves the land area,improves the utilization efficiency of infrastructure facilities,saves energy and materials consumption,reduces the construction investment and operating costs,improves the efficiency of all personnel and design efficiency.The case can offer reference for the layout of multi-mines coal preparation plants with similar conditions.

mining area planningmulti-mines coal preparation plantintensive layoutsite selection

卫玉花

展开 >

国家能源集团技术经济研究院,北京 102209

矿区规划 群矿型选煤厂 集约化布局 选址

2024

煤炭工程
煤炭工业规划设计研究院

煤炭工程

CSTPCD北大核心
影响因子:0.806
ISSN:1671-0959
年,卷(期):2024.56(6)
  • 12