Transformation and optimization design of mining auxiliary transportation system for gently inclined coal seam group
To solve a series of problems caused by the complexity of auxiliary lifting and transportation systems in the development process of gently inclined coal seam groups,it is proposed to transform the Shajihai No.1 mine into a trackless auxiliary lifting and transportation system based on the construction of a new gentle slope incline.Combined with the layout of the opening,the mine is optimized and designed to use gentle slope incline,also working as an auxiliary transportation rise,for the development of coal seam group.Reducing the number of mining areas and extending the service life of each mining area are conducive to alleviating the tense situation of mining and excavation continuity.The optimization ideas for the development of Shajihai No.1 mine provide a reference for the development of coal seam group in Xinjiang.
gently inclined coal seam groupauxiliary transportationdevelopment optimizationmining area continuation