首页|张双楼煤矿大型贯通工程实践总结

张双楼煤矿大型贯通工程实践总结

扫码查看
多年来煤矿测量技术更新变化不大,《煤矿测量规程》长期未修订,已不满足当前矿山测量需求.通过系统总结张双楼煤矿12年来6个大型贯通工程实例,在使用现行精度仪器情况下,采用"四架法"测量工艺,可大大提高贯通精度,实际贯通精度明显高于《煤矿测量规程》规定标准.实践证明,"四架法"测量速度快、精度高,特别是三角高程测量闭合精度达到三等、接近二等水准测量要求的精度.为同行业从业者提供参考依据或后续规程修订提供基础支撑,具有较高的推广应用价值.
Summary of practice of large scale penetration engineering in Zhangshuanglou Coal Mine
Over the years,the coal mine surveying technology has not changed much,and the Coal Mine Surveying Regulations has not been revised for a long time,which can no longer meet the current needs of mine survey.Systematically summarized six large-scale pen-etration engineering examples in the past 12 years in Zhangshuanglou Coal Mine.With the use of current precision instruments,the"four frame method"measurement process can greatly improve the penetration accuracy.The actual penetration accuracy was significantly higher than the standard specified in the Coal Mine Surveying Regulations.Practice has proved that the"four frame method"has high measurement speed and accuracy,especially the closure accuracy of trigonometric leveling can reach the third class and close to the ac-curacy required by the second class levelling.Providing reference basis or basic support for subsequent regulations revision for practi-tioners in the same industry has high promotion and application value.

large scale coal mine penetrationaccuracy evaluationfour frame measurement processregulations for coal mine surveying

刘焕新、杨成、周大伟

展开 >

江苏徐矿能源股份有限公司,江苏徐州 221006

张双楼煤矿,江苏徐州 221611

中国矿业大学,江苏徐州 221116

煤矿大型贯通 精度评定 四架法测量工艺 《煤矿测量规程》

国家自然科学基金项目

52104174

2024

煤炭科技
江苏省徐州矿务集团有限公司 江苏省煤炭学会 中国矿业大学

煤炭科技

影响因子:0.17
ISSN:1008-3731
年,卷(期):2024.45(1)
  • 15