综采工作面末采期间让压间隔煤柱宽度研究

扫码查看
针对综采工作面末采期间基本顶超前破断造成顶板台阶下沉、压架等技术难题,以邵寨煤矿一盘区首采1502工作面为工程背景,分析了停采让压回撤通道围岩控制机理,并对停采让压合理位置进行了确定.鉴于煤柱失稳具有突然性、瞬时冲击破坏性等特征,基于尖点突变理论,理论得出停采让压时间隔煤柱宽度为5.6 m;对其影响因素进行分析可知,煤岩层分界面黏聚力C0和弹塑性分界面侧压系数4对其影响最为显著,最终确定间隔煤柱6.0 m时,工作面停采让压.现场矿压监测表明,贯通期间未产生压架、冒顶事故,综采设备安全回撤.
Study on width of yield interval coal pillar during final mining of fully-mechanized mining face
In view of the technical problems such as roof bench subsidence and frame pressing caused by advanced breakage of the basic roof during the final mining of fully-mechanized mining face,this article took No.1502 working face of the first mining area in Shaozhai Coal Mine as the engineering background,analyzed the mechanism of controlling the surrounding rock of stop mining and allow pressure retreat channel,and determined the reasonable position of stopping mining and yield pressure.In view of the characteristics of coal pillar instability such as suddenness and instantaneous impact destructiveness,based on the cusp catastrophe theory,it was theoretically con-cluded that the width of the coal pillar at the time of stopping mining and yielding pressure was 5.6m.Through analysis of its influen-cing factors,it can be seen that the cohesive force C0 at the interface of the coal layer and the lateral pressure coefficient A at the elastic-plastic interface have the most significant impact on it.Finally,when the interval between the coal pillars was 6.0 m,the working face would stop mining and yield pressure.The on-site mine pressure monitoring indicated that there were no frame pressing and roof falling accidents during the penetration period,and the fully-mechanized mining equipment was safely withdrawn.

fully-mechanized mining facecatastrophe theorystop mining and allow pressureinterval coal pillar

张军、朱友恒

展开 >

华能灵台邵寨煤业公司,甘肃平凉 744401

综采工作面 突变理论 停采让压 间隔煤柱

2024

煤炭科技
江苏省徐州矿务集团有限公司 江苏省煤炭学会 中国矿业大学

煤炭科技

影响因子:0.17
ISSN:1008-3731
年,卷(期):2024.45(2)
  • 15