首页|倾斜煤层工作面覆岩"三带"数值模拟研究

倾斜煤层工作面覆岩"三带"数值模拟研究

扫码查看
为了准确划分倾斜煤层工作面覆岩"三带"的分布范围,提出了以理论计算结果为基础,将煤层倾角纳入影响因素,分别沿煤层走向、煤层倾向模拟工作面开采覆岩移动过程,对比分析得出采场顶板垮落带与导水裂缝带最大发育高度.根据盘吉煤矿Z14-2W01工作面地质开采条件,采用数值模拟方法划分覆岩"三带"并通过现场实测进行验证.研究结果表明:倾斜煤层工作面采用数值模拟方法得出的垮落带与导水裂缝带高度,与现场实测结果较为接近,其准确性得到验证.
Numerical simulation study on"three zones"of overlying rock in inclined coal seam working face
In order to accurately divide the distribution range of the"three zones"of the overburden in the inclined coal seam working face,it was proposed to take the theoretical calculation results as the basis,incorporate the coal seam inclination angle into the influen-cing factors,and simulate the movement process of overlying rock during mining along the coal seam direction and inclination.Compara-tive analysis was conducted to determine the maximum development height of the roof collapse zone and the water conducting fracture zone in the mining area.According to the geological mining conditions of Z14-2W01 working face in Panji Coal Mine,numerical simula-tion method was adopted to divide the"three zones"of overburden rock and verified by field measurement.The research results showed that the height of the caving zone and the water-conducting fracture zone obtained by numerical simulation method in the inclined coal seam working face was close to the field measured results,and its accuracy was verified.

UDECcaving zonewater-conducting fracture zone

张康、陈亮、王正帅

展开 >

中煤科工集团重庆研究院有限公司,重庆 400037

UDEC 垮落带 导水裂缝带

2024

煤炭科技
江苏省徐州矿务集团有限公司 江苏省煤炭学会 中国矿业大学

煤炭科技

影响因子:0.17
ISSN:1008-3731
年,卷(期):2024.45(6)