近距离煤层底板应力分布规律及巷道布置研究

扫码查看
为探究上煤层遗留煤柱对底板的应力影响及下煤层回采巷道的合理布置,以唐山沟煤矿为研究对象,运用理论分析和数值模拟等方法并综合多种影响因素构建了上煤层遗留煤柱与铰接岩块的协同承载结构模型和底板应力传递计算模型,对上煤层遗留煤柱下底板应力及影响因素展开研究.结果表明:上煤层遗留煤柱对底板的应力影响以垂直应力为主,影响程度随底板深度的增加而降低;遗留煤柱下底板应力增高区呈椭球形,对底板应力增高区的影响因素展开分析,得到了不同因素对应力增高区范围影响的量化关系,其中煤柱峰值应力对底板应力增高区分布起决定性作用;根据底板应力分布特征并结合理论计算及数值模拟结果,确定唐山沟煤矿 8煤遗留煤柱与 11-1 煤回采巷道合理错距值应为 20~25 m.该研究揭示了上煤层遗留煤柱下底板应力传递机理,明确了底板应力增高区的分布及影响因素,并得到了巷道-煤柱合理错距值的确定方法,可为下煤层回采巷道的合理布置提供理论依据.
Study on floor stress distribution law and roadway layout of contiguous coal seams
In order to explore the influence of the remaining coal pillar in the upper coal seam on the stress of the floor and the reasonable layout of the mining roadway in the lower coal seam,taking Tangshangou Coal Mine as the research object,the theoretical analysis and numerical simulation methods and a variety of influencing factors were used to construct the collaborative bearing structure model of the remaining coal pillar and the hinged rock block in the upper coal seam and the stress transfer calculation model of the floor,and the stress and influencing factors of the floor under the remaining coal pillar in the upper coal seam are studied.The research shows that the influ-ence of the remaining coal pillars in the upper coal seam on the stress of the floor is mainly vertical stress,and the influence degree de-creases with the increase of floor depth.The stress-increasing area of the floor under the remaining coal pillar is ellipsoidal.The influen-cing factors of the stress-increasing area of the floor are analyzed,and the quantitative relationship between the influence of different factors on the range of the stress-increasing area is obtained.The peak stress of the coal pillar plays a decisive role in the distribution of the stress-increasing area of the floor.According to the stress distribution of the floor and the results of theoretical calculation and numerical simulation,it is determined that the reasonable stagger distance between the 8 coal pillar and the 11-1 coal mining roadway in Tang-shangou Coal Mine should be 20-25 m.This study reveals the stress transfer mechanism of the lower floor of the coal pillar left in the up-per coal seam,clarifies the distribution and influencing factors of the floor stress increase area,and obtains the determination method of the reasonable stagger value of the roadway-coal pillar,which can provide a theoretical basis for the reasonable layout of the lower coal seam mining roadway.

contiguous coal seamremaining coal pillarfloor stressroadway layout

张杰、孙建平、何义峰、张一铭、庞海波、武浩昊、张建辰、彭冰

展开 >

西安科技大学能源学院,陕西西安 710054

西安科技大学教育部西部矿井开采及灾害防治重点实验室,陕西西安 710054

中国联合网络通信有限公司陕西省分公司,陕西西安 710000

陕西省矿产资源调查评审中心,陕西西安 710054

展开 >

近距离煤层 遗留煤柱 底板应力 巷道布置

国家自然科学基金资助项目国家自然科学基金资助项目

5177422952004200

2024

煤炭科学技术
煤炭科学研究总院

煤炭科学技术

CSTPCD北大核心
影响因子:2.095
ISSN:0253-2336
年,卷(期):2024.52(8)
  • 16