针对一起220 kV邻近输电杆塔取土工程,通过 FLAC 3D三维数值模拟取土过程,分析输电杆塔基础变形特性,验证在输电杆塔保护区采用钢板桩加固方案是否合理、有效,为邻近输电杆塔取土工作提供参考借鉴.

Abstract

In response to the soil sampling of a nearby 220 kV transmission tower,the deformation characteristics of the foundation of the transmission tower were analyzed through FLAC 3D three-dimensional numerical simulation of the soil sampling process.The rationality and effectiveness of using steel sheet pile reinforcement scheme in the protection area of the transmission tower were verified,providing reference for similar soil sampling of adjacent transmission towers.

关键词

输电杆塔/模拟取土/加固

Key words

transmission towers/simulated soil sampling/reinforce