农村电气化2024,Issue(11) :53-56,61.DOI:10.13882/j.cnki.ncdqh.2405A015

一起10 kV线路连续故障分析及供电可靠性提升措施探讨

Analysis of Continuous Faults in a 10 kV Transmission Line and Discussion on Measures to Improve Power Supply Reliability

朱杰
农村电气化2024,Issue(11) :53-56,61.DOI:10.13882/j.cnki.ncdqh.2405A015

一起10 kV线路连续故障分析及供电可靠性提升措施探讨

Analysis of Continuous Faults in a 10 kV Transmission Line and Discussion on Measures to Improve Power Supply Reliability

朱杰1
扫码查看

作者信息

  • 1. 国网浙江省电力有限公司玉环市供电公司,浙江 玉环 317600
  • 折叠

摘要

梅雨季潮湿天气使沿海地区变电站的安全运行受到一定威胁,而且2座变电站共计 7条 10 kV线路连续出现故障实属罕见.因此,开展对此次故障线路的事故分析,对于沿海地区供电企业重新审视配电网的潜在威胁并针对性制定供电可靠性提升措施具有重要的现实意义.

Abstract

the wet weather during plum rain season has posed a great threat to the reliable running of substations in coastal areas.Particularly,it is quite rare that 7 10 kV distribution lines connected to 2 110 kV substations breakdown continuously.Thus,failure analysis on this phenomenon would make significant sense to coastal power supply companies for re-examine these potential threats and make measures to improve power supply reliability in distribution network.

关键词

梅雨季/配电网/威胁/故障分析

Key words

plum rain season/distribution network/threat/failure analysis

引用本文复制引用

出版年

2024
农村电气化
中国电机工程学会

农村电气化

ISSN:1003-0867
段落导航相关论文