The widespread adoption of mechanized construction in power engineering is the main solution to the rising labor costs and safety control pressure.This paper analyzes the mechanical equipment that can be selected to improve the mechanization rate and develop a mechanical digital construction application plan based on the construction scenario of the main power transmission line.
关键词
机械化施工/施工场景/机械化率/数字化施工运用方案
Key words
mechanized construction/construction scene/mechanization rate/digital construction application plan