The total amount of water pollutant discharge is closely related to the water quality.The common meth-ods are empirical coefficient method and model simulation method.Based on the characteristics of water pollutant dis-charge in Shanghai and the actual situation of the data,this paper investigates various source pollution discharge modes and combines the research results of secondary pollution,environmental statistics and online monitoring data to create a high-resolution real-time total amount accounting model system with daily load analysis as the core,the pur-pose of ensuring the water quality of the monitoring section is achieved through accounting analysis and verification.
Real time totalAccounting methodWater quality section guarantee