An integrated anaerobic membrane bioreactor device was designed to treat wastewater through three stages:anaerobic sludge domestication and cultivation,determination of optimal operating parameters,and rapid start-up of the membrane bioreactor.The experimental results show that the COD removal rate of the bioreactor is stable at over 80%,and it has good application effect in actual sewage treatment.