首页|非对称运行西河泵站前池试验分析

非对称运行西河泵站前池试验分析

扫码查看
为明确西河泵站非对称机组运行时前池的流态特征,基于物理模型试验的方法对西河泵站的前池及进水流道进行整体物理模型试验,共获取4种不同开机方案时西河泵站前池的流场和速度分布规律,并采用计算流体动力学技术对最低水位时8台机组全开的方案进行数值分析。结果表明:在0。75负荷排涝时,非对称机组运行方案2的前池两侧有微弱旋流,开机方案3和开机方案4前池流态均平稳,开机方案3泵站进口断面的底流速分布均匀度为78。2%;推荐两侧边机组和中间机组各2台开机运行;在全负荷排涝流量且最低水位时,机组全开时两边机组流道进口的水力性能指标最低,在实际运行时应注意两侧边机组运行的安全稳定性。研究成果可为西河泵站的实际运行管理提供一定的参考。
Experimental analysis of forebay of Xihe pumping station under asymmetric operation
The forebay is a structure connecting the suction sump(inlet passage)and the diversion channel(igniting river)of the pumping station,and its flow pattern has a direct impact on the safe and stable operation of the pumping station unit.The drainage flow and diversion flow of Xihe pumping station in Zhongshan City,Guangdong Province,are both very large,and the diversion condition is lateral inflow.Higher requirements are now set forward for the flow conditions of the forebay of the pumping station.If the incoming flow of the forebay is not uniform,there will be adverse flow patterns such as bias flow,deflected flow,backflow,and air-core vortex,which will adversely affect the safe operation of the Xihe pumping station and the operating efficiency of the unit.In order to clarify the flow pattern characteristics of the forebay of Xihe pumping station during the operation of asymmetric units,taken the Xihe pumping station project as the research object,the physical model test method was used to carry out the overall physical model test of the forebay and inlet passage of the pumping station during different startup combinations.The computational fluid dynamic technology was used to numerically analyze the operation scheme of eight units fully open at the lowest water level.It was found that,when the eight units of the Xihe pumping station are fully opened for drainage,the mainstream is centered in the inland river diversion section.The surface velocity in the mainstream zone is mostly in the range of 0.9 m/s to 1.2 m/s and the surface velocity in front of the inlet of the pumping station is in the range of 0 to 0.6 m/s.In the outlet sump and the outer river section of the pumping station,the surface velocity in the mainstream zone is mostly in the range of 0.9 m/s to 1.2 m/s,and the maximum velocity is 1.44 m/s.The flow pattern of the upstream and downstream diversion sections of the pumping station is relatively smooth.The water surface fluctuation at the inlet of the pumping station is small,and the water flow is relatively stable and smooth.Under the asymmetric unit operation scheme 2,the surface velocity in the mainstream zone of the inland river diversion section is mostly in the range of 0.6 m/s to 1.0 m/s and the surface velocity in front of the inlet of the pumping station is in the range of 0 to 0.4 m/s.In the outlet sump and the outer river section of the pumping station,the surface velocity in the mainstream zone is mostly in the range of 0.6 m/s to 1.0 m/s,and the maximum velocity is 1.32 m/s.Affected by the non-startup of the number 1 and number 8 units,the flow velocity at the middle bottom is greater than that on both sides,and a weak recirculation zone is formed at the inlet of the non-startup unit,but there is no harmful surface vortex.Under start-up scheme 3,the surface velocity in the mainstream zone of the inland river diversion section is mostly in the range of 0.6 m/s to 1.0 m/s and the surface velocity in front of the inlet of the pumping station is in the range of 0 to 0.4 m/s.In the outlet sump and the outer river section of the pumping station,the surface velocity in the mainstream zone is mostly in the range of 0.6 m/s to 1.0 m/s,and the maximum velocity is 1.47 m/s.The bottom velocity distribution of the upstream section of the pumping station is more uniform along the section,and the bottom velocity distribution of the downstream section of the pumping station is also affected by the non-startup pump,with the bottom velocity in the range of 0.35 m/s to 0.81 m/s and 0.42 m/s to 0.61 m/s,respectively.Under start-up scheme 4,whose flow pattern of the forebay is stable and the uniformity of the bottom velocity distribution of the inlet section is 77.2%,the flow field distribution of the inlet and outlet surfaces of the pumping station is similar to that of start-up scheme 3.Under the conditions of full load drainage flow and the lowest water level,the difference in velocity distribution on both sides of the pier of the inlet passage of the side unit is more significant,and the difference in velocity distribution of the middle unit is smaller.There are some differences in the axial velocity distribution uniformity and velocity weighted average angle on both sides of the pier of the inlet passage of the intermediate unit and the side unit.Therefore,the safety and stability of the operation of the side unit should be paid attention to when the unit is fully opened.The followings are the results:(1)When the eight units of Xihe pumping station are fully opened for full load drainage and the lowest water level,the surface velocity in front of the inlet of the pumping station is small.The water surface fluctuation at the inlet of the pumping station is small and the water surface fluctuation at the outlet of the pumping station is slightly larger.The average uniformity of the axial velocity distribution in the inlet passage of eight units is 74.31%,and the average value of the velocity weighted average angle is 81.18°.The hydraulic performance index of the inlet surface of the inlet passage of the units on both sides is the lowest,and the stability and energy consumption of the operation are the largest.(2)At 75%of drainage load,the startup schemes of three different units were analyzed by a physical model.Under start-up scheme 3,the inlet flow pattern of the pumping station was stable.There was no obvious swirling flow,and the uniformity of velocity distribution at the bottom of the inlet section was 78.2%,which was higher than that of startup scheme 2 and startup scheme 4.Startup scheme 3 was recommended at 75%of the drainage load.The research results can provide a certain reference value for the actual operation and management of Xihe pumping station.

Xihe pumping stationforebayflow patternoperational schememodel test

徐鹏飞、陈业超、徐贵颖、张丽娟、杨帆

展开 >

淮安市水利勘测设计研究院有限公司,江苏淮安 223005

扬州大学水利科学与工程学院,江苏扬州 225009

中山市堤围管理中心,广东中山 528400

西河泵站 前池 流态 开机方案 模型试验

江苏省水利科技项目江苏省水利科技项目江苏省高等学校自然科学研究重大项目扬州市科技计划

2022010202101520KJA570001YZ2022192

2024

南水北调与水利科技(中英文)
河北省水利科学研究院

南水北调与水利科技(中英文)

CSTPCD北大核心
影响因子:0.772
ISSN:2096-8086
年,卷(期):2024.22(2)
  • 28