首页|预制装配率对装配式建筑工程造价的影响分析

预制装配率对装配式建筑工程造价的影响分析

扫码查看
针对装配式建筑相较于传统现浇式建筑工程造价增加问题,依据相关计算规则,在满足规范预制装配率的前提下,对不同类型装配式建筑、不同预制装配率的混凝土小高层住宅及不同预制构件类型的工程造价进行对比分析,探讨预制装配式建筑与传统现浇式建筑间的成本差异,并从经济角度出发,对预制构件、部品及技术的优先选择进行排序,以期为优化PC深化设计,探究投资最少、成本最低的预制装配率方案提供参考.
Influence of Prefabrication Rate on Cost of Prefabricated Construction
Compared with traditional cast-in-place buildings,the prefabricated assembling buildings are costlier.Based on the calculation rules and the standards for precast assembly rates,a comparative analysis is conducted on the construction cost of prefabricated buildings of different types,small high-rise concrete buildings with different prefabricated assembly rates and prefabricated components of different types.Cost differences between precast and traditional cast-in-place buildings are discussed.The precast components,parts and technologies are prioritized,which provides a reference for optimizing PC elaborated design and exploring the precast assembly rate solution with the least investment and the lowest cost.

prefabricated buildingprefabrication rateconstruction costassembly rate schemeprefabricated component

徐笛、徐广舒

展开 >

江苏浩森建筑设计有限公司 南通分公司,江苏 南通 226001

南通职业大学 建筑工程学院,江苏 南通 226007

装配式建筑 预制装配率 工程造价 装配率方案 预制构件

南通职业大学软科学研究计划

20RK01

2024

南通职业大学学报
南通职业大学

南通职业大学学报

影响因子:0.366
ISSN:1008-5327
年,卷(期):2024.38(1)
  • 7