Testing methods for connecting electrochemical energy storage stations to the power grid
With the increasing integration of renewable energy sources,the safe and stable operation of the power grid faces significant challenges.When issues such as active power deficits arise,the precision of power control and response time of renewable energy stations do not meet requirements,hindering their ability to quickly participate in peak shaving and regulate voltage and frequency within the grid.This paper elaborates on the testing methods for connecting electro-chemical energy storage stations to the power grid.It addresses issues such as inappropriate communication configura-tions and unreasonable software logic during testing,proposing corresponding optimization measures like"stop upon reaching limits."Validation of these measures shows that the proposed series of testing optimizations can effectively resolve problems related to excessive response times and inadequate power regulation during testing,significantly enhan-cing the efficiency of testing for energy storage stations connected to the power grid.