首页|湿法烟气脱硫系统的烟气换热器设置分析

湿法烟气脱硫系统的烟气换热器设置分析

扫码查看
通过对上海地区燃煤电厂湿法烟气脱硫系统安装和不安装烟气换热器(GGH)的运行分析,证实了安装GGH后的烟囱腐蚀,明显低于无GGH烟囱,尤其是针对GGH发生结垢、堵塞和腐蚀等问题采取的六大技术措施,能够达到环保考核要求,同时论述了脱硫系统取消GGH后,会给周边环境和生产运行安全带来隐患。为此,结合国家环保政策,提请各燃煤电厂在建设脱硫系统时,不应盲目取消脱硫系统的GGH装置。
Wet Flue Gas Desulfurization System Flue Gas Heat Exchanger Set Analysis
In recent years,to cancel the flue gas heat exchanger(GGH) and implemented in various power plants,but after a long run of wet chimney and flue corrosion of flue gas desulfurization(FGD) system to run the safety and reliability of a more serious impact.The discourse cancel GGH production run security risks,and of future environmental policy,to draw the attention of the thermal power plant in the construction of the desulfurization system should not blindly cancel desulfurization system GGH device.

desulfurization systemflue gas desulfurizationflue gas heat exchanger

陈震、张晟、张袆、卫建英

展开 >

上海市电力公司电力科学研究院,上海200437

外高桥第三发电责任有限公司,上海200137

上海吴泾发电有限责任公司,上海200241

上海电力股份公司闵行发电厂,上海200240

展开 >

脱硫系统 烟气脱硫 烟气换热器

2012

能源技术
上海市能源研究所 上海市工程热物理学会

能源技术

影响因子:0.301
ISSN:1005-7439
年,卷(期):2012.33(2)