程序化操作在练塘站的应用与思考

扫码查看
介绍了程序化操作的实现条件,比较了程序化操作的各种方案。针对IEC 61850在练塘站的应用情况,提出了三种情况下程序化操作的方案:500kV母线停复役、500kV主变停复役和220kV线路倒母线,并分析、切磋了相应的安全保障措施。提出了要进一步完善程序化操作方案,开展满足"大运行"、"大检修"模式下的运行需求调研和技术评估,加快制定相适应的管理规范和技术标准等建议。
Application and Thinking of Programming Operation in Liantang Station
Introduces the realization of procedural operation condition,compares the operation procedure of various schemes.According to IEC 61850 in liantang station application situation,this paper puts forward three cases programming operation plan: 500 kV bus stop after service,500 kV main transformer stop complex servants and 220 kV line down bus,and analysis,and learn from the corresponding security measures.Put forward to further improve programming operation plan and carry out meet "big operation","big overhaul" mode of operation demand research and technology assessment,we need to promptly formulate adapt to the management standards and technical standard and so on.

Programming operationSwitching operationIEC 61850Safety measures

李敏、陈宁

展开 >

上海市电力公司检修公司变电运维中心,上海200063

程序化操作 倒闸操作 IEC61850 安全措施

2012

能源技术
上海市能源研究所 上海市工程热物理学会

能源技术

影响因子:0.301
ISSN:1005-7439
年,卷(期):2012.33(5)
  • 3