能源科技2024,Vol.22Issue(5) :46-48.

梅花井煤矿巷道穿层掘进施工工艺研究

Study on Construction Technology of Roadway Tunneling through Layers in Meihuajing Coal Mine

周平顺 王玉
能源科技2024,Vol.22Issue(5) :46-48.

梅花井煤矿巷道穿层掘进施工工艺研究

Study on Construction Technology of Roadway Tunneling through Layers in Meihuajing Coal Mine

周平顺 1王玉1
扫码查看

作者信息

  • 1. 国家能源集团宁夏煤业有限责任公司梅花井煤矿,宁夏 灵武 750408
  • 折叠

摘要

以梅花井煤矿111808工作面运输巷回风联络巷穿层掘进为例,研究了穿层掘进中存在的问题,并提出相应的措施,通过实际应用,快速形成了连续运输系统,确保巷道安全高效掘进,保障了矿井正常采掘接续.

Abstract

The cross-layer tunneling of transport roadway and return airway crossheading for the 111808#working face of Meihuajing Coal Mine was taken as an example to study the problems existing in the tunnel-ing through layers and put forward corresponding measures.According to the effect of practical application,a continuous transportation system is quickly developed,which ensures safe and efficient transportation of road-way,and facilitates the normal mining-excavation succession in the mine.

关键词

穿层掘进/顶板/硬岩

Key words

Tunneling Through Layers/Roof/Hard Rock