Shenchinan Station is the"west gate"of Shuozhou-Huanghua Railway.In recent years,the vol-ume of the station continues to run at a high level and increases year by year,and the capacity of the sta-tion tends to be saturated.Considering the long-term development of Shuozhou-Huanghua Railway Company,in order to adapt to the development trend of 450 million ton capacity expansion and transformation of Shuo-zhou-Huanghua Railway,based on the existing running equipment and transport organization method of Shenchinan Station,the formation plan for 30,000 ton heavy-haul trains is discussed.Based on the principle that the train with mass of 30,000t takes the shortest time to arrive at the arrival and departure track,the optimal scheme of the 30,000t heavy haul trains is analyzed,and the suggestion on station transformation un-der the condition of normal operation of the train with mass of 30,000t are put forward to improve the trans-port efficiency.
关键词
神池南站/3万t重载列车/列车编组模式/到发线占用时间/通过能力
Key words
Shenchinan Station/30,000t Heavy Haul Trains/Train Formation Mode/Arrival and Departure Track Occupancy Time/Throughput Capacity