摘要

潞安余吾煤业3 号煤层N1100工作面开采过程中,巷道顶板变形严重,普通锚索支护方式难以适应巷道的大变形破坏规律,已经严重影响到了矿井的安全生产以及经济效益.针对矿区生产特点、地质条件以及矿压显现规律,提出一种恒阻大变形锚索补强支护控制技术,解决了动压巷道现有支护条件下面临的顶板下沉量大、变形严重的问题,为矿井带来安全和高效的生产效益,同时也为类似的工程活动提供技术上的借鉴.

Abstract

During the mining process of the N1100 working face in the No.3 coal seam of Lu'an Mine Yu-wu Coal Industry,the roadway roof deforms severely,and the ordinary anchor cable support method is diffi-cult to adapt to the large deformation and damage law of the roadway,which has seriously affected the safety production and economic benefits of the mine.This paper proposes a control technology for constant-resis-tance large deformation anchor cable reinforcement and support based on the production characteristics,geolog-ical conditions and mine pressure behavior law.It solves the problem of significant roof subsidence and se-vere deformation faced under the existing support conditions,bringing safe and efficient production benefits to the mine,and also providing technical reference for similar engineering activities.

关键词

恒阻大变形/锚索/工作面

Key words

Constant-Resistance Large Deformation/Anchor Cable/Working Face