A Case Study of Sewage Treatment Engineering Design in a Maintenance Workshop
A certain maintenance workshop will generate wastewater during the maintenance process.This treatment project adopts the"regulation+air flotation+initial sedimentation+micro electrolysis+Fenton+primary A/O+MBR-membrane bioreactor"treatment process.The sludge treatment process adopts the"sludge concentration+box filter press"dehydration process,and the relevant process design parameters and equipme nt configuration are explained.