For engineering slopes generated by excavation under sloping terrain,in order to ensure the safety of the main structure,appropriate retaining measures are often taken to protect the slopes.The construction of the overhead superimposed water plant site is affected by the roads built in the first phase and the existing eastern suburbs water plant.Settlement and deformation need to be controlled,and slopes cannot be placed due to the limitations of the red line of cultivated land.The slope protection scheme adopted on site is"pile-anchor support+retaining wall support+hardened step slope protection",which is verified to be effective through monitoring and measurement results.
关键词
边坡工程/桩锚支护/挡墙支护/监控量测/斜坡地形
Key words
slope engineering/pile-anchor support/retaining wall support/monitoring and measurement/slope topography