首页|特大断面双线隧道CRD工法受力变形特性分析

特大断面双线隧道CRD工法受力变形特性分析

扫码查看
随着中国高速公路建设的迅速发展,特大断面双洞隧道的建设成为关注焦点。该文基于ABAQUS有限元软件,对特大断面双洞隧道采用CRD工法的动态施工力学行为进行数值模拟分析。研究结果表明,右洞隧道后行开挖对左洞围岩产生二次扰动和位移叠加,导致围岩沉降量和影响范围增大;同时,右洞开挖会影响左洞拱腰区域水平应力和拱腰扩张值,以及拱肩区域水平应力和拱肩收敛值。在先行洞开挖过程中,后行洞开挖释放地下应力,影响先行洞的支撑结构。研究结果对特大断面双洞隧道的施工具有重要指导意义。
With the rapid development of highway construction in China,the construction of ultra-large-section double-hole tunnels has become the focus of attention.Based on ABAQUS finite element software,this paper carries out numerical simulation and analysis on the dynamic construction mechanical behavior of a super-large cross-section double-hole tunnel using CRD method.The research results show that the rearward excavation of the right tunnel will cause secondary disturbance and displacement superposition on the surrounding rock of the left tunnel,resulting in an increase in the settlement and influence range of the surrounding rock;at the same time,the excavation of the right tunnel will affect the horizontal stress and the waist expansion value in the waist area of the left tunnel,as well as the horizontal stress and the shoulder convergence value in the shoulder area.During the excavation of the leading tunnel,the excavation of the trailing tunnel releases underground stress,which affects the supporting structure of the leading tunnel.The research results have important guiding significance for the construction of super-large cross-section double-hole tunnels.

extra-large-section tunnelCRD methodnumerical simulationsurrounding rock displacementsupporting structure

张立锐

展开 >

浙江交工金筑交通建设有限公司,杭州 310051

特大断面隧道 CRD工法 数值模拟 围岩位移 支撑结构

2025

科技创新与应用
黑龙江省报刊出版有限公司 黑龙江省科协技术协会

科技创新与应用

影响因子:0.993
ISSN:2095-2945
年,卷(期):2025.15(2)