Analysis and Application of Heavy-duty Distribution Station Area Based on Charging Pile Data
With the large number of charging piles and the disorder of charging,it has a certain impact on the increase of heavy load in the platform area.The heavy-duty station area analysis application based on charging pile data was developed.Firstly,users in the heavy-duty station area and the heavy-duty period in the area were screened out,and then whether the heavy load was related to the charging pile was analyzed and sent to the station manager through SMS for on-site processing to reduce the power consumption of the charging pile.In addition,through V2G transformation and other ways,the suitable platform area is transformed to reduce the construction cost;According to the development trend of charging pile,the capacity of the platform area is planned in advance.Finally,the validity of the proposed method is verified by an actual case of a station area.