青海电力2024,Vol.43Issue(3) :53-57.DOI:10.15919/j.cnki.qhep.2024.03.011

电网大频差扰动情况下水电机组一次调频动作不合格原因分析及建议

Analysis and Suggestion on Unqualified Primary Frequency Regulation Action of Hydropower Unit Under the Condition of Large Frequency Difference Disturbance in Power Grid

周军 马春安 马梦尧 王正伟
青海电力2024,Vol.43Issue(3) :53-57.DOI:10.15919/j.cnki.qhep.2024.03.011

电网大频差扰动情况下水电机组一次调频动作不合格原因分析及建议

Analysis and Suggestion on Unqualified Primary Frequency Regulation Action of Hydropower Unit Under the Condition of Large Frequency Difference Disturbance in Power Grid

周军 1马春安 1马梦尧 1王正伟1
扫码查看

作者信息

  • 1. 国网青海省电力公司电力科学研究院,青海西宁 810008
  • 折叠

摘要

选取2022年、2023年三次青海电网大频差扰动期间两台一次调频动作不合格的水电机组进行研究,同时选取不合格机组一次调频试验数据以及 2024 年动作合格数据进行分析,探明前三次大频差扰动期间机组一次调频动作不合格原因,同时为水电机组后续一次调频试验以及考核评价方法提出建议.

Abstract

A study was conducted on two 2023 hydropower units whose primary frequency modulation(FFM)operations were not up to standard during 2022 and three times of large frequency difference disturbances in Qinghai power grid,at the same time,the data of the first FM test and the qualified data of the 2024 operation of the unqualified units were analyzed to find out the reasons for the unqualified first FM operation of the units during the first three large frequency difference disturbances,at the same time,some suggestions are put forward for the following frequency modulation test and the evaluation method.

关键词

大频差/一次调频/水电机组

Key words

large frequency difference/primary frequency modulation/hydropower unit