By researching the water cooling process of 3LPE/PP anti-corrosion steel pipes,the surface temperature of the anti-corrosion layer are monitored,the current situation of the production line are analyzed,the problems of the production process are identified,the systematic technological innovation and optimization are carried out,the cooling capacity of the pipeline water cooling system is enhanced,the problem of high surface temperature and substandard quality of the anti-corrosion pipe outlet during the production process are solved effectively,and improving production efficiency.The results are applied to the anti-corrosion cooling process of other steel pipes and bimetallic composite pipes.
关键词
3LPE/PP/防腐/水冷却/厚壁管/深水
Key words
3LPE/PP(three layer polyethylene and polypropylene)/anti corrosion/water cooling/thick walled pipe/deep water