This paper deeply analyzes the main quality control points in the construction process of bored pile and puts forward a number of effective control measures and optimization strategies,focusing on the preparation work before construction,the technical points in the construction process and the quality detection methods after construction.It provides theoretical basis and practical guidance for improving the construction quality of bored pile in municipal engineering.
关键词
市政工程/钻孔灌注桩/施工质量控制/技术要点/质量检测
Key words
municipal engineering/bored pile/construction quality control/technical points/quality inspection